Robust scheduling for parallel machines with sequence dependent setup times and uncertain breakdowns
dc.contributor.advisor | Kundakcıoğlu, Ömer Erhun | |
dc.contributor.advisor | Yanıkoğlu, İhsan | |
dc.contributor.author | Top, Ayşenur Betül | |
dc.date.accessioned | 2020-12-06T14:14:08Z | |
dc.date.available | 2020-12-06T14:14:08Z | |
dc.date.submitted | 2017 | |
dc.date.issued | 2018-08-06 | |
dc.identifier.uri | https://acikbilim.yok.gov.tr/handle/20.500.12812/103544 | |
dc.description.abstract | Bu çalışmada, elektronik sektöründe çalışan bir şirketin plastik enjeksiyon üretimiyapan tesisinde makine çizelegeleme süreci incelenmiştir. Bu şirket, ürünlerini kenditasarlar ve bu ürünler için müşterilerden sipariş toplar. Son ürün üretim çizelgesindedonmuş periyot vardır ve son üründe kullanlacak tüm malzemelerin üretim öncesindehazır olması beklenmektedir. Aksi takdirde, malzemelerin gecikmesi, üretim duruşuveya donmuş plandaki revizyonlar nedeniyle ceza maliyetine sebep olmaktadır. Plastikenjeksiyon üretim tesisinde paralel makinalar vardır. Kurulum zamanı iş vesıralama bağlıdır. Ayrıca, plastik enjeksiyon makinelerinde belirsiz makine arızalarıvardır. Sıralamaya bağlı kurulumları ve belirsiz makine arızaları göz önüne alan birüretim programı, gecikmeyi en aza indirmek amacıyla geliştirilmiştir. Onerilen karışık ¨tamsayılı kuadratik programlama formülasyonu için çözüm, makine arızaları için enkötü durum senaryolarının olası etkilerini dikkate alan güçlü bir program sağlar.Anahtar Kelimeler: paralel makine çizelgeleme; sıra bağımlı kurulum süresi;belirsiz makine arızaları; gürbüz çizelgeleme | |
dc.description.abstract | In this study, machine scheduling activities in the plastic injection production facility of a company competing in electronic sector is investigated. The company designs the products and picks order from customers for these products. There is a frozen production period for the end-product production schedule and all materials to be used in the end-product are expected to be prepared before the production. Otherwise, tardiness of materials leads to penalty costs due to production disruptions and revisions in the frozen plan. There are parallel machines in the plastic injection production facility. Setup time is job and sequence dependent. Furthermore, there are random machine breakdowns in the plastic injection machines. A production schedule that considers sequence-dependent setups, uncertain machine breakdowns is developed with the objective of minimizing tardiness. The solution for the proposed mixed integer quadratic programming formulation provides a robust schedule, which takes possible effects of worst-case scenarios for machine breakdowns into account.Keywords: parallel machine scheduling; sequence-dependent setup times; uncertain machine breakdown; robust scheduling | en_US |
dc.language | English | |
dc.language.iso | en | |
dc.rights | info:eu-repo/semantics/openAccess | |
dc.rights | Attribution 4.0 United States | tr_TR |
dc.rights.uri | https://creativecommons.org/licenses/by/4.0/ | |
dc.subject | Endüstri ve Endüstri Mühendisliği | tr_TR |
dc.subject | Industrial and Industrial Engineering | en_US |
dc.title | Robust scheduling for parallel machines with sequence dependent setup times and uncertain breakdowns | |
dc.title.alternative | Paralel makinelerde sıra bağımlı kurulum süreleri ve belirsiz arızaları olan gürbüz çizelgeleme | |
dc.type | masterThesis | |
dc.date.updated | 2018-08-06 | |
dc.contributor.department | Endüstri Mühendisliği Anabilim Dalı | |
dc.identifier.yokid | 10161053 | |
dc.publisher.institute | Fen Bilimleri Enstitüsü | |
dc.publisher.university | ÖZYEĞİN ÜNİVERSİTESİ | |
dc.identifier.thesisid | 478626 | |
dc.description.pages | 52 | |
dc.publisher.discipline | Endüstri Mühendisliği Bilim Dalı |